Published 25 November 2026 · 8 min read
- Why a standard sits behind your solar approval: When you register a rooftop solar system with Eskom or your municipality, the paperwork asks for the inverter make and model.
- What NRS 097-2-1 is, in plain language: NRS standards are produced in South Africa for the electricity supply industry.
- What the standard covers for small grid-tied inverters: Without quoting clauses, the subject areas are fairly consistent with how grid codes work around the world.
- Anti-islanding and why linesmen care: Anti-islanding is the part of the standard that most affects safety.
- Voltage and frequency windows: The grid is never perfectly steady.
Why a standard sits behind your solar approval
When you register a rooftop solar system with Eskom or your municipality, the paperwork asks for the inverter make and model. That small field exists because of a technical standard called NRS 097-2-1. It is the document utilities in South Africa point to when they decide whether a small grid-connected inverter is safe to plug into their network.
Most homeowners never read it, and you do not need to. But understanding what it is for will help you avoid one of the more expensive mistakes in residential solar: buying an inverter that your utility will not accept, after the money has already been spent.
This guide explains the standard in general terms, how utilities use it in practice, and how to check a model before you commit. It is not a substitute for the current text of the standard or for your utility's own rules, which can change.
What NRS 097-2-1 is, in plain language
NRS standards are produced in South Africa for the electricity supply industry. The NRS 097 family deals with the connection of small-scale embedded generation to the distribution network. The part numbered 2-1 deals with the utility interface: how a small generator, which in practice means a solar inverter, behaves when it is connected in parallel with the grid.
Think of it as a rulebook for good behaviour. A solar inverter sitting on your roof is a small power station. The network operator needs to know that it will not damage equipment, endanger linesmen, or disturb the supply quality of your neighbours. The standard sets out requirements and test approaches so that those assurances can be given before thousands of inverters are connected.
It sits alongside, not in place of, other requirements. Your wiring must still comply with SANS 10142-1 and be covered by a Certificate of Compliance from a registered electrician. The SSEG registration process with your utility is still required. The standard is one layer in a stack of rules.
Because standards are revised from time to time, the exact requirements depend on the edition your utility currently references. Always check the current edition and your utility's published requirements rather than relying on an older summary, including this one.
What the standard covers for small grid-tied inverters
Without quoting clauses, the subject areas are fairly consistent with how grid codes work around the world. In general terms, the standard concerns:
- Protection settings: the inverter must watch the grid voltage and frequency and disconnect if they move outside acceptable windows
- Anti-islanding: the inverter must stop feeding power when the grid is down, rather than energising a section of network on its own
- Reconnection behaviour: after an outage, the inverter must wait and confirm that the grid is stable before it exports again
- Power quality: limits on harmonics, flicker and DC injection so the inverter does not pollute the network
- Power control behaviour: how the inverter reduces output or responds when voltage or frequency is high
- Documentation and marking: the information that must be supplied so the unit can be assessed and identified
These are the same themes you will see in the grid codes of many countries. The detail differs, and the South African details are what the utility cares about.
Anti-islanding and why linesmen care
Anti-islanding is the part of the standard that most affects safety. Imagine a storm trips a feeder and a municipal team goes out to repair it. They isolate the line and treat it as dead. If dozens of rooftop inverters on that feeder kept pushing power into it, the line would be live, and the people working on it would be at serious risk.
A compliant grid-tied inverter detects loss of grid and shuts off its export within a very short time. This is why an ordinary grid-tied inverter switches off during load shedding. It is not a fault. It is the inverter doing exactly what the standard requires.
This is also the reason hybrid inverters have a separate backup output. When the grid fails, a hybrid inverter disconnects from the grid with an internal switch, and then supplies your protected circuits as an isolated mini-system. The grid-facing side is still behaving safely, while the backup side keeps your essential loads running. If you are choosing between system types, our guide on hybrid, grid-tied and off-grid systems explains the differences in detail.
Never attempt to defeat or bypass the disconnection function, and never let an installer connect a generator or inverter to your supply in a way that could back-feed the network. It is unsafe and it is illegal.
Voltage and frequency windows
The grid is never perfectly steady. Voltage rises and falls with load, and frequency drifts slightly. The standard defines the ranges inside which an inverter should keep operating, and the points at which it should disconnect.
For homeowners, this has one practical consequence. In areas with high network voltage, typically where a feeder carries a lot of solar and little load in the middle of the day, an inverter may trip on over-voltage or reduce its output. This can look like a mysterious drop in production on sunny afternoons.
If your system trips repeatedly, the inverter log will usually show the reason. Do not adjust protection settings yourself. These settings are locked to the approved profile for a reason, and changing them could take the system outside what your utility approved. Ask your installer to check the voltage at your point of supply, and if the grid is the cause, raise it with the utility.
Approved inverter lists: how utilities use them
Utilities do not have time to study the test data for every inverter that arrives with an application. Instead, many maintain a list of inverter models they accept. If your model is on the list, the application is simpler. If it is not, the utility may ask for test reports or certification, or may reject the application.
The practical points to understand:
- The list is maintained by the utility or by a body acting for it, and it changes as products are added or removed
- Matching is by model, and sometimes by firmware or rating, so a brand name alone is not enough
- Eskom and individual municipalities may not keep identical lists, so what is accepted in one supply area is not guaranteed in another
- A cheap import with no local approval is a risk, even if it works perfectly electrically
Our advice is simple. Before you pay for any grid-connected inverter, get the exact model number and check it against your utility's current approved list, or ask your installer to show you that check. Do this before the deposit, not after delivery.
How to check an inverter model before you buy
You can do most of the checking yourself in about ten minutes. Work through this order:
- Ask the seller for the exact model number, including any suffix, and the rating in kVA or kW
- Find your utility's current approved-inverter or SSEG requirements page, which is usually on the utility website under embedded generation
- Compare the model number against the list, and note the date the list was last updated
- If the model is not listed, ask the seller whether it has been submitted and whether they will guarantee acceptance in writing
- Confirm that the installer will complete the SSEG application with the same model number as the invoice
- Keep a copy of the datasheet and compliance documents with your records
Hybrid, grid-tied and battery inverters under the same standard
A common source of confusion is whether the standard only applies to grid-tied inverters with no battery. In general, any inverter that operates in parallel with the grid and can export energy is a candidate for the same kind of assessment, whether it also has a battery port or not. That includes hybrid inverters.
Where it gets trickier is with systems that are set to never export. Some owners choose zero-export settings to avoid the need for certain approvals or to meet municipal conditions. Even then, your utility may still require registration and may still require the inverter to be on its list. Do not assume that a zero-export setting removes your obligations. Registration is a separate question from whether power physically flows to the grid.
What the standard does not do
It helps to be clear about the limits.
The standard does not guarantee that your inverter is a good one. It addresses grid behaviour, not warranty quality, efficiency, build quality or how well the vendor supports the product in South Africa. Two approved inverters can be very different products to own.
It also does not replace your electrical installation rules. A perfectly approved inverter wired with undersized cable or a missing surge protector is still a bad installation. That is the job of SANS 10142-1 and the electrician who signs your Certificate of Compliance.
And it does not decide your tariff, your feed-in arrangement, or whether you are allowed to export at all. Those come from your municipality or Eskom and may differ from one supply area to the next.
Next step
Before you buy, write down the exact inverter model in any quote you are considering and check it against your utility's current approved-inverter list and the current edition of the standard it references. If anything is unclear, ask for the answer in writing.
If you would like a hand, SA Solar Hub can quote a system using inverter models that we confirm against the utility requirements for your supply area, and handle the SSEG registration paperwork through a registered electrician. Send us your address and a recent electricity bill and we will take it from there.
Frequently asked questions
What is NRS 097-2-1?
NRS 097-2-1 is a South African standard that deals with how small embedded generators, mainly solar inverters, interface with the utility network. It covers areas such as grid protection, anti-islanding and power quality. Utilities use it as a reference when assessing inverters, so check the current edition and your own utility requirements.
Does my home solar inverter need to comply with it?
If the inverter will run in parallel with the grid, your utility will normally expect it to meet the relevant requirements. That includes most grid-tied and hybrid inverters. Ask your installer to confirm acceptance with your specific utility before you pay a deposit, because requirements can differ between supply areas.
Where do I find the approved inverter list?
Start on the website of your utility, either Eskom or your municipality, usually under embedded generation or SSEG. Some utilities publish a list of accepted models and some handle it through the application process. If you cannot find it, ask the utility directly and keep the reply for your records.
Why does my grid-tied inverter switch off in a blackout?
It switches off because of anti-islanding protection. The inverter must stop exporting when the grid is down so that it does not energise lines that repair crews believe are dead. To keep power on during outages you need a hybrid inverter with a backup output, usually with a battery.
Can I use a cheap imported inverter that is not on the list?
It is risky. Your utility may reject the application or ask for test reports you cannot easily obtain, and an unapproved unit can cause problems with insurance. Check the exact model against the utility list before buying, and ask the seller for written confirmation that it will be accepted.
Does a zero-export setting mean I can skip registration?
Do not assume so. Registration requirements are set by your utility and may apply even if the system is configured not to export. Check your utility rules and register the system through your installer. Operating an unregistered system can lead to penalties and problems with insurance claims.
Official sources
- Eskom
- SALGA / AMEU embedded generation resource portal (SSEG)
- SABS (publisher of NRS 097-2-1)
- Department of Employment and Labour (Electrical Installation Regulations, CoC)
Put it into practice
More guides
Compare systems, panels and brands
Panels and brands:
Complete guides: Solar panels in South Africa · Solar panel installation in South Africa