Short answer: Ask three registered installers for a written, line-by-line quote, then compare them on installed price per inverter kW and on rands per usable battery kWh. The cheapest total is usually the one missing the CoC, the utility registration or the DB upgrade.
What to send with your request
Four things turn a guess into a real quote, and they are the same four every installer will ask for. Have them ready and you can get three comparable quotes in a week instead of a month.
- Your latest electricity bill — the monthly kWh figure matters more than the rand amount, because it is what the system gets sized from.
- A photo of your roof — pitch, direction and shading decide how many panels fit and what mounting costs.
- A photo of your DB board — this is what tells an installer whether a board upgrade is in scope, which is the line item most often left out.
- Which circuits must stay on — lights, Wi-Fi, fridge, TV, or the whole house. This sets the battery size, and it is the single biggest cost in the quote.
Send these and get a sized quote
What a complete solar quote must list
Ten line items. Anything missing is a question to ask before you compare prices, because a missing line is usually a missing cost.
| Line item | What it must say |
|---|---|
| Panels | Count, watt rating per panel, brand and model. "6.6 kWp of panels" is not enough — 12 × 550 W Canadian Solar is. |
| Inverter | kW rating, single or three phase, brand and model, and whether it is hybrid, grid-tied or off-grid. |
| Battery | Usable kWh, not nominal. Chemistry, brand, and the communication protocol it uses with that inverter. |
| Mounting | Rail type and roof fixing method for your roof — tile, IBR or corrugated — and whether any roof repair is excluded. |
| DB and protection | Changeover, surge protection, breakers, earthing, and whether the DB board needs an upgrade. |
| Labour | Days on site, and the name and registration number of the electrician doing the work. |
| CoC | A Certificate of Compliance for the new work. If it is not on the quote, ask what it costs. |
| Utility registration | SSEG registration with your municipality or Eskom for anything grid-tied. Often omitted, and not optional. |
| Warranties | Separate terms for panels, inverter, battery and workmanship. They are never the same length. |
| Exclusions | What is specifically not included. A quote with no exclusions list is an incomplete quote. |
Compare on price per kW, not on the total
Two quotes are rarely the same size, so the totals are not comparable. These are the installed bands we see in November 2026, including mounting, cabling, protection, labour and CoC:
| System | Typical installed price | Per inverter kW |
|---|---|---|
| 3 kW inverter + 5 kWh battery (backup only) | R45 000 – R65 000 | R15 000 – R21 667 |
| 5 kW hybrid + 5 kWh battery + 6–8 panels | R85 000 – R120 000 | R17 000 – R24 000 |
| 8 kW hybrid + 10 kWh battery + 10–14 panels | R140 000 – R200 000 | R17 500 – R25 000 |
| 10 kW hybrid + 15 kWh battery + 18–20 panels | R180 000 – R270 000 | R18 000 – R27 000 |
| 12 kW three-phase + 15–20 kWh battery | R220 000 – R330 000 | R18 333 – R27 500 |
| Grid-tied 5 kWp, no battery | R55 000 – R80 000 | R∞ – R∞ |
Estimates, checked November 2026. A quote well under its band is not a bargain until you have found what was left out. Full cost per kW breakdown · Price guide
Red flags in a cheap quote
- No brands or model numbers, just "lithium battery" and "hybrid inverter".
- Battery quoted in nominal kWh so it reads larger than the usable figure.
- CoC, SSEG registration or the DB upgrade left out, then charged later.
- No registered electrician named, or the registration number is not given.
- A deposit over about 50% before anything arrives on site.
- A price far under the bands below — something has been left out of the scope.
If you are not paying cash
A financed install needs the same ten line items as a cash one, so get the quote first and the payment structure second. Rent-to-own, finance or cash compares the four ways to pay and lists the eight contract clauses that decide what you actually own.
Work out your own numbers first
Knowing roughly what you need makes a quote much easier to read. The solar calculator gives you an inverter size, battery kWh and panel count from your bill, and systems by size shows what each one runs.
Then check who you are dealing with: how to choose a solar installer is the 10-point vetting checklist, and installers near you lists coverage by area.
Frequently asked questions
How many solar quotes should I get?
Three. One quote gives you no reference point, and two often differ so much on scope that you cannot tell which is cheap. Three lets you see which line items everyone includes and which one installer has quietly dropped.
Is a solar quote free?
It should be. A site visit, load assessment and written quote are normally free in South Africa. Paying for a design is only reasonable if you are buying the design itself and can take it to any installer.
How long should a solar quote take?
A day or two for a written quote after the site visit. If an installer cannot produce a line-by-line quote within a week, that is a sign of how the install will run.
How do I compare two quotes that are not the same size?
Divide the installed price by the inverter kW to get a price per kW, then check the battery separately on rands per usable kWh. Those two numbers make different-sized quotes comparable.
Do I need to be home for the site visit?
Yes, for the first one. The installer needs to see the DB board, the roof and your bill, and you want to be there when the backup loads are decided.
What if I only want backup, not solar?
Say so on the quote request. An inverter and battery without panels is a much cheaper job, and quoting it as a full solar system wastes everyone’s time.
Complete guides: Solar panels in South Africa · Solar panel installation in South Africa
