Solar installers and solar companies in DR Congo

Mining and commercial sites use large off-grid hybrid plants; logistics via Kasumbalesa.

Short answer: Solar in DR Congo: we supply inverters, lithium batteries and panels from Gauteng, installed by a qualified local electrician. Hardware for a 5 kW hybrid kit costs about R53 000 before freight and duties (checked November 2026). Grid connection goes through SNEL.

Grid utilitySNEL
CurrencyCDF
Grid230 V / 50 Hz (same as SA, so SA-spec inverters fit)

How cross-border supply works

  1. Send your load list or bill; we size the system.
  2. Quote in ZAR with export documents.
  3. Delivery to the border or by courier/freight to site.
  4. Install by a qualified local electrician; remote commissioning support from us.

Sun and fuel savings in DR Congo

DR Congo averages about 4.9 peak sun hours a day. A 20 kWp array, typical for a lodge, clinic or small commercial site, produces roughly 76 kWh a day. If that energy would otherwise come from a diesel generator (about 0.3 litres per kWh), the array saves around 23 litres of diesel a day, or roughly R16 511 a month at R24 a litre.

Why solar pays in DR Congo

Mining and commercial sites use large off-grid hybrid plants; logistics via Kasumbalesa. Wherever diesel generators fill gaps in the grid, every kWh from solar replaces fuel bought at a premium, which is why lodges, mines, offices and estates across the region recover their investment fastest.

Systems we supply to DR Congo

SystemTypical useIndicative equipment price (ZAR)
5 kW hybrid + 10 kWh + 6.6 kWpHomes, small officesR95,000 – R130,000
12 kW three-phase + 30 kWhLodges, clinics, retailR260,000 – R380,000
30–100 kW containerised hybridMines, farms, campsQuoted per project

Equipment prices ex-Gauteng before freight, duties and VAT charged by DR Congo. Payment in ZAR; CDF quotes on request.

Export documentation

Questions from DR Congo buyers

Can you deliver solar equipment to DR Congo?

Yes. We ship from Gauteng by road freight or courier to DR Congo, or to the border for your clearing agent. Lead time is usually one to three weeks depending on stock and customs.

Do South African inverters work on SNEL’s grid?

DR Congo runs a 230 V, 50 Hz grid like South Africa, so SA-spec inverters and batteries work. Some utilities have their own approval list for grid-connected inverters; we supply the certificates they ask for.

Who installs the system in DR Congo?

A qualified local electrician installs it. We provide the design, single-line diagram and commissioning checklist, and support the handover remotely.

Cities

Frequently asked questions

Do you supply and install solar in DR Congo?

Yes. Equipment is supplied from Gauteng and installed in DR Congo by a qualified local electrician working with us, with remote design and commissioning support.

How much does a 5 kW solar system cost in DR Congo?

The hardware for a 5 kW hybrid kit (inverter, 5 kWh lithium battery and about 11 panels of 550 W) currently comes to roughly R53 000 in South Africa (November 2026). Add freight, DR Congo import duty and VAT, and local installation. Quotes are issued in rand and can be paid from CDF via bank transfer.

Do South African inverters work on the DR Congo grid?

Yes. DR Congo runs 230 V / 50 Hz like South Africa, so SA-spec hybrid inverters connect directly. Grid connection and any export approval go through SNEL.

How long does delivery to DR Congo take?

Typically one to two weeks by road freight from Gauteng, depending on stock, border clearance and distance. Customs documents (commercial invoice, packing list and, where it applies, an SADC certificate of origin) are prepared with the order.

Popular solar system sizes in DR Congo

Panels and brands installed in DR Congo:

Ready for a quote?
Send your latest electricity bill and roof photos on WhatsApp. We reply with a sized system and price band.
WhatsApp 081 285 7634
Get a free sized quote in 24 hours

Complete guides: Solar panels in South Africa · Solar panel installation in South Africa

WhatsApp