Short answer: Solar in Matola, Mozambique: equipment supplied from Gauteng and installed by a qualified local electrician. Hardware for a 5 kW hybrid kit costs about R53 000 before freight and Mozambique duties (checked November 2026). Grid connection goes through EDM (Electricidade de Moçambique).
| Country | Mozambique |
|---|---|
| Utility | EDM (Electricidade de Moçambique) |
| Currency | MZN |
Industrial and residential hub next to Maputo, a short drive from the Lebombo border.
Sun and fuel savings in Matola, Mozambique
Mozambique averages about 5.2 peak sun hours a day. A 20 kWp array, typical for a lodge, clinic or small commercial site, produces roughly 81 kWh a day. If that energy would otherwise come from a diesel generator (about 0.3 litres per kWh), the array saves around 24 litres of diesel a day, or roughly R17 522 a month at R24 a litre.
Why solar pays in Matola, Mozambique
Coastal installs need marine-grade fixings. Supply crosses at Lebombo/Ressano Garcia. Wherever diesel generators fill gaps in the grid, every kWh from solar replaces fuel bought at a premium, which is why lodges, mines, offices and estates across the region recover their investment fastest.
Systems we supply to Mozambique
| System | Typical use | Indicative equipment price (ZAR) |
|---|---|---|
| 5 kW hybrid + 10 kWh + 6.6 kWp | Homes, small offices | R95,000 – R130,000 |
| 12 kW three-phase + 30 kWh | Lodges, clinics, retail | R260,000 – R380,000 |
| 30–100 kW containerised hybrid | Mines, farms, camps | Quoted per project |
Equipment prices ex-Gauteng before freight, duties and VAT charged by Mozambique. Payment in ZAR; MZN quotes on request.
Export documentation
- Commercial invoice and packing list
- SADC certificate of origin where it applies (reduces duty on qualifying goods)
- Equipment datasheets and certificates for EDM (Electricidade de Moçambique) or the local authority
- Single-line diagram and commissioning checklist for the local electrician
Questions from Mozambique buyers
Can you deliver solar equipment to Matola, Mozambique?
Yes. We ship from Gauteng by road freight or courier to Matola, Mozambique, or to the border for your clearing agent. Lead time is usually one to three weeks depending on stock and customs.
Do South African inverters work on EDM (Electricidade de Moçambique)’s grid?
Mozambique runs a 230 V, 50 Hz grid like South Africa, so SA-spec inverters and batteries work. Some utilities have their own approval list for grid-connected inverters; we supply the certificates they ask for.
Who installs the system in Matola, Mozambique?
A qualified local electrician installs it. We provide the design, single-line diagram and commissioning checklist, and support the handover remotely.
Other cities in Mozambique
Frequently asked questions
Do you supply and install solar in Matola?
Yes. Equipment is supplied from Gauteng and installed in Matola by a qualified local electrician working with us, with remote design and commissioning support.
How much does a 5 kW solar system cost in Matola?
The hardware for a 5 kW hybrid kit (inverter, 5 kWh lithium battery and about 11 panels of 550 W) currently comes to roughly R53 000 in South Africa (November 2026). Add freight, Mozambique import duty and VAT, and local installation. Quotes are issued in rand and can be paid from MZN via bank transfer.
Do South African inverters work on the Mozambique grid?
Yes. Mozambique runs 230 V / 50 Hz like South Africa, so SA-spec hybrid inverters connect directly. Grid connection and any export approval go through EDM (Electricidade de Moçambique).
How long does delivery to Matola take?
Typically one to two weeks by road freight from Gauteng, depending on stock, border clearance and distance. Customs documents (commercial invoice, packing list and, where it applies, an SADC certificate of origin) are prepared with the order.
Popular solar system sizes in Matola
Panels and brands installed in Matola:
Complete guides: Solar panels in South Africa · Solar panel installation in South Africa
