Tshwane SSEG Application: Step-by-Step Walkthrough

How a Pretoria homeowner gets solar approved by the City of Tshwane: the usual SSEG steps, documents, the electrician role and what to check first.

Published 25 November 2026 · 6 min read

Key takeaways
  • Why Pretoria homeowners need to register: If you live in Pretoria and your house is supplied by the City of Tshwane, a solar system that can run alongside the municipal grid is treated as a small-scale embedded generator, or SSEG.
  • Check who actually supplies your electricity: Not every Pretoria address is a Tshwane customer.
  • What you need before you apply: The City will expect a complete technical package, and the quickest applications are the ones where everything is ready on day one.
  • The usual steps, in order: The sequence below is the general pattern across South African metros, and Tshwane follows the same logic.
  • Why the electrician and the CoC matter: In South Africa, the AC side of any solar installation is electrical work that must be done or signed off by a registered person.

Local page: solar installers and prices in Pretoria.

Why Pretoria homeowners need to register

If you live in Pretoria and your house is supplied by the City of Tshwane, a solar system that can run alongside the municipal grid is treated as a small-scale embedded generator, or SSEG. That label covers nearly every modern hybrid or grid-tied installation, even if you never plan to send a single unit back to the grid.

The reason is safety and network planning. A system that can energise your wiring while the street is dead is a risk to municipal linesmen. The City also needs to know how much generation is connected to each transformer. Registration is how it keeps track.

This walkthrough describes the process in general terms. Municipal forms, fees, portals and turnaround times change, so treat everything below as the shape of the process and confirm the details with the City's current SSEG requirements before you sign anything.

Check who actually supplies your electricity

Not every Pretoria address is a Tshwane customer. Parts of the greater Pretoria area, including some outlying suburbs, smallholdings and townships, are supplied directly by Eskom instead. Your prepaid token or your monthly bill shows which utility you buy from.

This matters because the application goes to whoever owns the network at your meter. A Tshwane account means the City's SSEG process. An Eskom account means Eskom's own process, which has different forms and a different pace. Sending an application to the wrong utility is a common time-waster.

Also confirm whether your property is on a prepaid or conventional meter. Many municipalities need to change or reconfigure the meter on an SSEG property, and the meter type affects what the City will offer.

What you need before you apply

The City will expect a complete technical package, and the quickest applications are the ones where everything is ready on day one. In general you should have the following.

Your installer normally prepares the technical pieces. If a quote does not mention the SSEG application at all, ask who is responsible for it before you pay a deposit.

The usual steps, in order

The sequence below is the general pattern across South African metros, and Tshwane follows the same logic. Check the City's current forms for exact names and requirements.

The step people skip most often is the first one. Installing first and applying later can mean the City asks you to disconnect, or refuses to bill you correctly once it finds a system it did not know about.

Why the electrician and the CoC matter

In South Africa, the AC side of any solar installation is electrical work that must be done or signed off by a registered person. The Certificate of Compliance is the legal record that the new wiring meets SANS 10142-1. Without it, the City will usually not complete registration, and your insurer may query a claim later.

A CoC is not a formality that any installer can stamp. Ask to see the electrician's registration details and make sure the certificate carries your address and the work actually done, including the solar circuits, the isolators and the protection devices.

Keep the CoC and the City's approval letter together. When you sell the house, a buyer's attorney or inspector may ask for both, and an unregistered system can complicate a transfer.

Inverter settings and NRS 097-2-1

NRS 097-2-1 sets how an inverter must behave when connected to the grid: how it detects a grid failure, how quickly it disconnects, voltage and frequency limits and how it limits export. The City will normally want evidence that your inverter model is compliant, usually a certificate or a listing from the manufacturer.

Check this before buying equipment. A cheap inverter without the right documentation can stall the whole application, and replacing it later costs far more than a bit of homework now.

Your inverter's grid code or country setting also matters. It should be set to a South African profile so that the protection limits match the standard. A good installer will confirm this during commissioning.

Export, metering and what the City may change

Many Pretoria homeowners install solar only to cut their own consumption and want nothing exported. That is allowed in principle, and a well-configured hybrid inverter can be set to zero export. Tell the City what you intend, because the application usually asks.

If you do want to export, or the City requires a bidirectional or reconfigured meter, the process is longer. Whether exported units earn a credit, and at what rate, is set by the municipality and can change. Do not build your payback calculation on an export income you have not confirmed in writing.

Metering changes can come with fees, and a prepaid meter can complicate things. Ask the installer how this was handled on similar Pretoria properties and what the City's current meter policy says.

How long it takes and how to keep it moving

Turnaround depends on the City's workload, the completeness of your file and whether the system is residential or larger. Some applications clear within weeks and some take noticeably longer. It is wise to plan the installation date around the approval, not the other way round.

A few habits speed things up.

How Tshwane differs from Johannesburg is mostly in the forms, the portal and the internal routing, not the principle. If you have read about the City Power process, the Tshwane one asks for the same kind of evidence, just packaged differently.

Common mistakes to avoid

Most failed or delayed applications come down to a handful of avoidable errors.

That last point catches people out. If you grow the system from a 5kW inverter to a bigger one, or add a second inverter, tell the City. The registered capacity should always match what is on the roof.

Next step

Start by finding out who supplies your address, then ask for the City's current SSEG forms and requirements so you know what it expects today. Gather your account details and ownership proof, and get your installer to confirm in writing who handles the application, the single line diagram and the CoC.

If you are comparing quotes for a Pretoria home, send SA Solar Hub your address, your monthly consumption and what you want to keep running during load-shedding. We will tell you what the installation would involve and help you prepare for the registration, so approval is a planned step and not a surprise at the end.

Frequently asked questions

Do I need to register solar with Tshwane if I have no export?

Yes, in general. A system that can run in parallel with the grid is an embedded generator whether or not it exports. Registration is about safety and network planning, not only about selling power. Check the City's current SSEG rules for your system type before installing, because requirements can change.

Who submits the Tshwane SSEG application?

Often your installer prepares and submits the technical package, but the account holder or owner remains responsible. Ask in writing who handles it. You will need to supply ownership proof, your municipal account details and sign consent where the City asks for it.

Do I need a Certificate of Compliance for solar?

Yes. The AC wiring must be done or signed off by a registered electrician, who issues a CoC under SANS 10142-1. The City normally wants it to complete registration, and buyers or insurers may ask for it later, so keep a copy with your approval letter.

Can I install first and apply later?

It is a bad idea. The City can ask you to disconnect an unregistered system, and billing or metering problems can follow. Apply before energising the system, and ideally before installing, so any query is resolved while changes are still cheap.

What if I live in a part of Pretoria supplied by Eskom?

Then the process goes through Eskom, not the City of Tshwane. Your electricity bill or prepaid token shows your supplier. Each utility has its own forms and timing, so confirm the supplier first before preparing paperwork.

Will Tshwane pay me for the power I export?

Do not assume so. Whether exports earn a credit, and at what rate, is decided by the municipality and can change. Many homes are set to zero export. Ask the City for its current position in writing and keep your payback maths based on self-use.

Official sources

Put it into practice

More guides

Compare systems, panels and brands

Panels and brands:

Ready for a quote?
Send your latest electricity bill and roof photos on WhatsApp. We reply with a sized system and price band.
WhatsApp 081 285 7634
Get a free sized quote in 24 hours

Complete guides: Solar panels in South Africa · Solar panel installation in South Africa

WhatsApp