Solar Installation Company With CoC: How to Verify One

How to confirm a solar installation company with CoC is genuine: registered contractor, signing electrician, SSEG paperwork and the documents to ask for.

Published 26 November 2026 · 7 min read

Key takeaways
  • How do you verify a solar installer's registration and CoC?: Ask for three things in writing before you pay a deposit: the company's electrical contractor registration, the name and registration details of the registered electrician who will sign off the work, and a commitment to issue a Certificate of Compliance (CoC) under SANS 10142-1.
  • Why the paperwork matters more than the panels: A solar system is a permanent electrical installation connected to your home's wiring.
  • The company side: registered electrical contractor: Electrical installation work in South Africa is done under the supervision of a registered person.
  • The person side: the registered electrician who signs: The CoC is signed by a registered electrician, registered through the Department of Employment and Labour.
  • Industry credentials that add confidence: Beyond the legal registrations, there are industry credentials that show an installer takes quality seriously.

How do you verify a solar installer's registration and CoC?

Ask for three things in writing before you pay a deposit: the company's electrical contractor registration, the name and registration details of the registered electrician who will sign off the work, and a commitment to issue a Certificate of Compliance (CoC) under SANS 10142-1. Then confirm those details yourself rather than trusting a logo on a quote.

This article is about verification, not explanation. If you want to know what the CoC is and what it covers, our guide to the electrical CoC for solar explains the standard. Here we focus on the practical checks you can do from your couch in about an hour, and what a genuine answer looks like compared with a vague one.

Why the paperwork matters more than the panels

A solar system is a permanent electrical installation connected to your home's wiring. If it is done badly, the problems are not cosmetic. They can mean tripping, burnt cables, a failed insurance claim or a fire.

The CoC is the document that says a qualified person has inspected and tested the installation and found it compliant. Without a valid one, a few things tend to go wrong later. Your insurer may question a claim. A buyer's conveyancer may refuse to accept the house without it. The municipality may not approve your grid connection. And if something fails, you have no independent record of what was done.

So when you shop for a solar installation company with CoC capability, you are really checking two things: that the company is allowed to do this work, and that a named person is putting their registration behind it.

The company side: registered electrical contractor

Electrical installation work in South Africa is done under the supervision of a registered person. A company that installs solar should operate as, or work under, a registered electrical contractor. A contractor is a business registration; it is separate from the personal registration of an individual electrician.

What to ask for:

Watch for a mismatch. If the quote comes from one brand name, the invoice from a second company and the CoC from a third person who has never been on site, ask why. Subcontracting is common and not wrong in itself, but you should know who is doing what and who signs. A clear answer comes quickly. A defensive or vague answer is information too.

The person side: the registered electrician who signs

The CoC is signed by a registered electrician, registered through the Department of Employment and Labour. This is the person who inspects and tests the installation and puts their name to it. Ask for their name, their registration category and a copy of their registration card.

Be specific when you ask. Say: "Who will sign the CoC for my installation, and may I see their registration?" You want to hear a name, not "our team".

Then check that the card is current and that the name on it matches the name that later appears on the CoC. If the department or the contractor's office can confirm a registration by phone or email, use that route and note the date you asked. You do not need to be confrontational. A reputable installer expects the question, because customers who ask are the ones who end up with proper paperwork.

One more point. The person who signs should be the person who tests. If a sign-off is simply handed over by someone who never visited the site, that is not what the CoC is for.

Industry credentials that add confidence

Beyond the legal registrations, there are industry credentials that show an installer takes quality seriously. None of them replaces the electrical registration, but they are useful tie-breakers.

Treat these as supporting evidence. An installer with a glossy badge and no registered electrician is worse than a quiet one with the right registrations and a clean record on site.

Grid connection: SSEG registration and approved inverters

If your system is grid-tied or hybrid, which includes almost every modern home system, it must be registered with your municipality or Eskom as small-scale embedded generation (SSEG). Running a grid-connected inverter without approval can lead to fines or a forced disconnection, and it is a common reason a house sale stalls.

Ask the installer two direct questions:

A good installer will name the process for your area and explain who signs what. We have separate walkthroughs for Johannesburg, Tshwane and Ekurhuleni, because each office has its own forms. Do not accept "you don't need to register, everyone just connects". If a quote leaves SSEG out entirely, ask whether it is excluded or simply forgotten, and what it will cost.

Keep a copy of the application and any approval. It belongs in the same folder as your CoC.

What the quote should say about the CoC

The wording in the quote tells you a lot. Look for a line that states that a CoC will be issued under SANS 10142-1 by a registered electrician on completion. Look for the SSEG application being listed as either included or excluded. And look for the company's registered name and contractor details on the document itself.

Warning signs include:

Compliance is part of the job, not an optional extra. If a CoC is charged separately, it should be a stated line item, and you should understand why. For more on reading line items, see our guide to comparing two quotes line by line.

Check the CoC itself when you get it

On handover day, do not just file the CoC. Read it. Check that your name and the property address are correct, that the date is the date of the completed work, and that the installation described covers the solar system, the distribution board changes and any new sub-board.

Then check that the registered person's name and registration number are printed, that the signature is present, and that the test results are attached or recorded. If a section is blank, ask why. If the CoC covers only part of the work, for example a new plug point but not the inverter circuit, you do not have what you paid for.

Also keep the supporting documents together: the signed quote, the invoice, equipment serial numbers, the inverter and battery warranty documents, and the commissioning record. If you ever sell the property, these are the papers a buyer's agent will ask for. We explain that in our article on selling a house with solar.

Questions to ask before you sign

Put these to every installer on your shortlist. The answers, not the price, should decide who stays on it.

Write down the answers and keep them with the quote. If two installers give very different answers on the same question, find out why before you compare prices.

Next step

If you are comparing installers, start with the paperwork rather than the price. Send each company the list above and see who answers clearly and quickly.

SA Solar Hub is based in Gauteng and quotes homes and businesses across South Africa and the SADC region. Send us your latest electricity bill and the area you live in, and we will explain the compliance steps for your municipality alongside a quote. You can then compare our answers to anyone else's, line by line.

Frequently asked questions

Who signs the CoC for a solar installation?

A registered electrician signs it, registered with the Department of Employment and Labour. That person inspects and tests the installation against SANS 10142-1 before putting their name on the certificate. Ask for their name and registration card before the work starts, and check that the same name appears on the final CoC you receive.

Is a PV GreenCard the same as a CoC?

No. A PV GreenCard is an industry quality programme for PV installers, while a CoC is a legal compliance document for the electrical installation. A good installer may have both, but one does not replace the other. You still need a CoC signed by a registered electrician even if the team holds PV GreenCard.

Can I get a CoC after the solar system is already installed?

Yes, but only if a registered electrician inspects and tests the whole installation and finds it compliant. If the original work was not done to standard, corrections come first and can cost money. It is far cheaper to confirm during the quote stage that a CoC is included and who will sign it.

Do I need to register my solar system with the municipality?

Yes, grid-tied and hybrid systems must be registered with the municipality or Eskom as SSEG, and the inverter should be on the utility's approved list under NRS 097-2-1. Registration processes differ by area, so ask the installer who submits the application and whether it is included in the quoted price.

What if an installer says a CoC is not needed for solar?

Treat that as a red flag and walk away or get a second quote. A solar system changes your electrical installation, so compliance paperwork is part of the job. An installer who dismisses it is either unregistered or cutting corners, and either way the risk lands on you, your insurer and any future buyer.

Should I pay the final invoice before I receive the CoC?

Ideally the CoC is handed over with the final invoice, not weeks later. Agree this in the quote: the final payment is due on completion, commissioning and delivery of the CoC. If the installer wants full payment first and promises paperwork afterwards, ask for the CoC date in writing.

Official sources

Put it into practice

More guides

Compare systems, panels and brands

Panels and brands:

Ready for a quote?
Send your latest electricity bill and roof photos on WhatsApp. We reply with a sized system and price band.
WhatsApp 081 285 7634
Get a free sized quote in 24 hours

Complete guides: Solar panels in South Africa · Solar panel installation in South Africa

WhatsApp